| Project Title | POWER PLANT BATAMINDO PHASE 1 16 MW AND PHASE 2, 9 MW, GAS ENGINE TYPE 3 X 620 GS NL ENCLOSURE |
| Client | MAX POWER |
| Main Contractor | BATAMINDO |
| Site Location | Batam |
| Contract Year | 2022 |
DESCRIPTION
- PULLING CABLE POWER
- JOINTING CABLE POWER Phase 1. 16 MWAND PHASE 2 9MW, CONTINUITY.
- MEGGER, INSULATION TESTING ,HIGHT VOLTAGE
- TERMINTATION AND TORQUE