Project Title POWER PLANT BATAMINDO PHASE 1 16 MW AND PHASE 2, 9 MW, GAS ENGINE TYPE 3 X 620 GS NL ENCLOSURE
Client MAX POWER
Main Contractor BATAMINDO
Site Location Batam
Contract Year 2022

DESCRIPTION

  1. PULLING CABLE POWER
  2. JOINTING CABLE POWER Phase 1. 16 MWAND PHASE 2 9MW, CONTINUITY.
  3. MEGGER, INSULATION TESTING ,HIGHT VOLTAGE
  4. TERMINTATION AND TORQUE